Dr. Turley Renovation - Beaumont Subdivision - Lexington, KY

Dr. Paul and Leann Turley's family is growing. They wanted to finish out their basement into a new multi-purpose room. Paul likes to play in a band so a small sound stage would be nice, a theatre system with surround sound was a must, a wet bar, an additional bathroom, more shelving and storage space, a new salt water aquarium, a decorative waterfall and a nice place for the kids to play were all requirements for our designers.

The Turley's solicited proposals from three local general contractors and Construction Mangement Associates was selected. This selection was based on the best proposal. Paul said we were not the cheapest... but that he felt our proposed package was the most professional and was the best fit for his needs.

This 1,450 square foot basement renovation features a decorative waterfall at the bottom of the stairs, accenting your entry into this newly renovated space. We created a storage room behind the waterfall and another around the corner with additional shelving for storage in both.

The main room showcases a brick walled stage with dark hardwood on the floor. The stage does double duty as a focal point for a big screen theatre room system. Behind the theatre room is a counter with stools for lounging, chatting or watching the big screen. Behind the counter is a full wetbar with sink, wine rack and storage cabinets. To the rear of the wetbar is a half bath.

A new salt water acquarium opens into the bar area on one side and the great room/play area for the kids on the other.The coral is being shipped from the Pacific Ocean and the fish will be introduced when the aquarium environment is just right. A bit of a wait but this accent will be top notch!

Take a look below to see some pictures of this wonderful basement renovation by CMA!

[nggallery id=14]